31
6-17. EHPT20X-MHCWR1.UK, EHST20C-MHCWR1.UK, EHST20D-MHCWR1.UK
Tool
Tool
Conductor
Conductor
Outline view
Top view
<How to use TBO.1 to 4>
Connect them using either way as shown below.
N
L
S3
S2
S1
N
L
S3
S2
S1
To outdoor
unit
TB1
OG
OG
YE
YE
GNYE
To outdoor
unit
Power supply
~/N 230V 50Hz
TB1
OG
BU
RD
BU
RD
YE
GNYE
1
3
CN3C
(BU)
BK
BK
BK
BK
1
3
OG
BN
CN3C
(BU)
OG
OG
BN
YE
Indoor unit powered
by independent source
Indoor unit powered
via outdoor unit
CIRCUIT BREAKER
1
3
CN3C
(BU)
1
3
CNPWM
(WH)
LED1
LED2
LED3
LED4
TBI.1
TBI.2
13
10
12
14
11
7
4
6
5
9
3
2
8
1
13
10
12
14
11
7
4
6
5
9
3
2
8
1
13
10
12
14
11
7
4
6
5
9
3
2
8
1
IN6
IN1
IN2
IN3
IN4
IN5
IN7
THW8
THW7
THW6
THW9
THWB1
THWB2
t°
t°
t°
t°
t°
t°
Main remote controller
1
+ - + - + -
2
1
2
CN20 (RD)
TH1
t°
1
3
CN21 (YE)
TH2
t°
1
4
THW1
THW2
CNW12
(RD)
t°
t°
1
2
THW5
CNW5 (WH)
t°
CN108
5
1
Wireless receiver
(Option)
WiFi adapter
(Option)
5
1
5
1
CNRF
(WH)
CN105
(RD)
CN22
(BU)
1
3
5
7
1
3
5
Close
Open
N
X6
X7
TBO.2
TBO.1
F1
F2
MXV
M
1~
MP2
MP1
M
1~
1
3
CNV1
(WH)
1
3
CNBHT
(BK)
CNBC
(GY)
CNBH
(WH)
X4
X14
X3
X2
X1
X5B
X5A
1
2
3
4
5
6
1
2
3
4
5
6
1
1
3
3
3
CNP1
(WH)
CNP4
(RD)
CNPWM
(WH)
TBO.1
TBO.2
TBO.3
TBO.4
CNP1
(WH)
CNP4
(RD)
CNV1
(WH)
CN22
(BU)
CNIT
(BU)
TAB1
CN01
(WH)
F2
F1
IEC T6.3AL250V
IEC T10AL250V
SW1
SW2
SW3
SW4
SW5
1
8
1
8
1
1
5
3
1
3
1
3
8
1
8
1
6
CN01
(WH)
CN01
(WH)
2
1
4
6
2
1
1
2
4
6
4
6
CNBH
(WH)
CNBC
(GY)
1
1
3
1
2
1
2
1
2
CNBHT
(BK)
1
3
7
1
3
CNIH
(OG)
1
4
1
3
CNW5
(WH)
CN21
(YE)
CNW12
(RD)
CN20
(RD)
TBI.2
MP3
M
1~
IN8
IN9
IN10
TBI.3
TBI.3
1
4
CN1A
(WH)
TBI.1
2WV2b
M
1~
M
1~
MP4
M
1~
1
3
L
(1)
N
(3)
OG
RD
BU
BU
RD
OG
IHC
IHT
IH
6
4
2
5
3
1
A1
A2
A B
2 4
Immersion heater (1Ph3kW)
Power supply
to Immersion heater
~/N 230V 50Hz
1
2
CNIH
(OG)
3
3WV
M
1~
ECB2
1
2
4
6
CN01
(WH)
X15
X12
TBO.3
X11
X10
1
2
3
4
5
6
7
8
Signal output
(Boiler)
Signal output
(Error)
Signal output
(Defrost)
Signal output
(Comp. ON)
1
2
3
4
5
6
TBO.4
M
2WV2a
1
3
X9
X8
X13
CNIH
(OG)
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
7
8
1
2
3
4
5
6
12 14
6
10
8
13
7
11
9
4
5
3
2
1
12 14
6
10
8
13
7
11
9
4
5
3
2
1
12 14
6
10
8
13
7
11
9
4
5
3
2
1
Flow Sensor
1
4
CN1A
(WH)
1. Symbols used in wiring diagram
are,
: connector,
:
terminal block.
2. Indoor unit and outdoor unit
connecting wires have polarities,
make sure to match terminal
numbers (S1, S2, S3) for correct
wirings.
3. Since the outdoor unit side electric
wiring may change, be sure to
check the outdoor unit electric
wiring diagram for service.
Table 1 Signal Inputs
Name Terminal block Connector
Item
OFF (Open)
ON (Short)
IN1 TBI.1 13-14
— Room thermostat
1 input
Refer to SW2-1 in
<6-19. DIP switch functions>.
IN2 TBI.1 11-12
—
Flow switch 1
input
Refer to SW2-2 in
<6-19. DIP switch functions>.
IN3
TBI.1 9-10
—
Flow switch 2
input (Zone1)
Refer to SW3-2 in
<6-19. DIP switch functions>.
IN4
TBI.1 7-8
— Demand control
input
Normal
Heat source OFF/
Boiler operation *2
IN5
TBI.1 5-6
— Outdoor thermo-
stat input *1
Standard opera-
tion
Heater operation/
Boiler operation *2
IN6
TBI.1 3-4
— Room thermostat
2 input
Refer to SW3-1 in
<6-19. DIP switch functions>.
IN7
TBI.1 1-2
—
Flow switch 3
input (Zone2)
Refer to SW3-3 in
<6-19. DIP switch functions>.
IN8
TBI.3 1-2
—
Electric energy
meter 1
Refer to installation manual.
IN9
TBI.3 3-4
—
Electric energy
meter 2
IN10
TBI.3 5-6
— Heat meter
IN1A TBI.3 12-14 CN1A
Flow sensor
*1. If using outdoor thermostat for controlling operation of heaters, the lifetime of the
heaters and related parts may be reduced.
*2. To turn on the boiler operation, use the main remote controller to select “Boiler” in
“External input setting” screen in the service menu.
Table 2 Outputs
Name Terminal block Connector
Item
OFF
ON
OUT1 TBO.1 1-2 CNP1
Water circulation pump 1 output (Space heating &
DHW)
OFF
ON
OUT2 TBO.1 3-4
—
Water circulation pump 2 output (Space heating for
Zone1)
OFF
ON
OUT3 TBO.1 5-6
—
Water circulation pump 3 output (Space heating for
Zone2) *1
OFF
ON
2-way valve 2b output *2
OUT4 TBO.2 4-6 CNV1
3-way valve output
Heating
DHW
OUT5
TBO.2 1-2
—
Mixing valve output *1
Stop
Close
TBO.2 2-3
Open
OUT6
—
CNBH 1-3 Booster heater 1 output
OFF
ON
OUT7
—
CNBH 5-7 Booster heater 2 output
OFF
ON
OUT9 TBO.4 3-4 CNIH Immersion heater output
OFF
ON
OUT10 TBO.3 1-2
—
Boiler output
OFF
ON
OUT11 TBO.3 3-4
—
Error output
Normal
Error
OUT12 TBO.3 5-6
—
Defrost output
Normal Defrost
OUT13 TBO.4 1-2
—
2-way valve 2a output *2
OFF
ON
OUT14
—
CNP4 Water circulation pump 4 output (DHW)
OFF
ON
OUT15 TBO.3 7-8
—
Comp. ON signal
OFF
ON
Do not connect to the terminals that are indicated as “—” in the “Terminal block” field.
*1. For 2-zone temperature control.
*2. For 2-zone valve ON/OFF control.
Symbol
Name
TB1
Terminal block <Power supply, Outdoor unit>
ECB2
Earth leakage circuit breaker for immersion heater
MP1
Water circulation pump 1(Space heating & DHW)
MP2
Water circulation pump 2
(Space heating for Zone1)(Local supply)
MP3
Water circulation pump 3
(Space heating for Zone2)(Local supply)
MP4
Water circulation pump 4 (DHW)
3WV
3-way valve
2WV2a
2-way valve (For Zone 1)(Local supply)
2WV2b
2-way valve (For Zone 2)(Local supply)
MXV
Mixing valve (Local supply)
IHT
Thermostat (fixed temp.) for immersion heater
IH
Immersion heater
IHC
Contactor for immersion heater
TH1
Thermistor (Room temp.)(Option)
TH2
Thermistor (Ref. liquid temp.)
THW1
Thermistor (Flow water temp.)
THW2
Thermistor (Return water temp.)
Symbol
Name
THW5
Thermistor (DHW tank water temp.)
THW6
Thermistor (Zone1 flow temp.)(Option)
THW7
Thermistor (Zone1 return temp.)(Option)
THW8
Thermistor (Zone2 flow temp.)(Option)
THW9
Thermistor (Zone2 return temp.)(Option)
THWB1
Thermistor (Boiler flow temp.)(Option)
THWB2 Thermistor (Boiler return temp.)(Option)
IN1
Room thermostat 1 (Local supply)
IN2
Flow switch 1 (Local supply)
IN3
Flow switch 2 (Local supply)
IN4
Demand control (Local supply)
IN5
Outdoor thermostat (Local supply)
IN6
Room thermostat 2 (Local supply)
IN7
Flow switch 3 (Local supply)
IN8
Electric energy meter 1 (Local supply)
IN9
Electric energy meter 2 (Local supply)
IN10
Heat meter (Local supply)
IN1A
Flow sensor
Symbol
Name
FLOW TEMP. CONTROLLER (FTC5)
TBO.1-4 Terminal block <Outputs>
TBI.1-3
Terminal block <Signal Inputs, Thermistor>
F1
Fuse (IEC T10AL250V)
F2
Fuse (IEC T6.3AL250V)
SW1-5
DIP switch *See <6-19. DIP switch functions>.
X1-15
Relay
LED1
Power supply (FTC5)
LED2
Power supply (Main remote controller)
LED3
Communication (FTC5-Outdoor unit)
LED4
Reading or writing data to SD card
CNPWM
Pump speed control signal for MP1
CN108 SD card connector
OCH570C
Summary of Contents for EHPT20X-MHCW
Page 108: ......