- 108 -
•
•
Test Run
[1] Check Items before Test Run
1
Check refrigerant leak, loose power source or transmission line if found.
Measure resistance between the power source terminal block and ground with a 500V megger to confirm it is exceeding 1.0M
Ω
.
Notes: 1.
2.
3.
4.
5.
2
3
Confirm that the ball valves are fully opened at both gas and liquid sides.
[When connected to the transmission booster for transmission line]
Before turning on the outdoor unit, turn on the transmission booster for transmission line.
Note: 1. Make sure to tighten the cap.
4
5
Check the phase order of the 3-phase power source and the voltage between each phase.
Note: 1. Open phase or reverse phase causes the emergency stop of test run. (4103 error)
6
Turn the main power source on 12 hours at least before test run to power the crankcase heater.
Note: 1. Shorter powering time may cause compressor trouble.
Do not operate the unit when the insulation resistance stays below 1.0M
Ω
.
Never apply a megger to the transmission line terminal block. Otherwise, the control board will be damaged.
At immediately after installation or when the unit is left with the main power source turned off for a long time, the insulation
resistance between the power source terminal block and ground may drop down to 1M
Ω
approximately due to refrigerant
accumulated inside the compressor.
When the insulation resistance counts for more than 1M
Ω
, power the crankcase heater for 12 hours or more by turning the main
power source on. Doing this way evaporates refrigerant inside the compressor leading to increase the insulation resistance.
Never measure the insulation resistance of the transmission terminal block for the MA remote controller.
Notes: 1.
2.
When the outdoor unit is turned on first, connection information of refrigerant system may not be confirmed normally.
If the outdoor unit is turned on first, after turning on the transmission booster for transmission line, reset the power of the outdoor
unit.
STAND BY
DEFROST
ERROR CODE
D A I L Y
AUTO OFF
CENTRALLY CONTROLLED
CLOCK
REMAINDER
ON OFF
ßC
1Hr.
NOT AVAILABLE
ßC
CHECK MODE
FILTER
CHECK
TEST RUN
LIMIT TEMP.
ON/OFF
TEMP
FILTER
CHECK TEST
ON OFF
CLOCK
PAR-F27MEA
TIMER SET
Test run display
ON/OFF lamp
ON/OFF button
Vertical air direction button
Test run button
Ventilation button
❉
The illustration shows MA remote controller.
( )Powering display
Check code display
Test run remaining time display
Indoor unit liquid pipe temperature display
Set temperature button
Operation selector button
Louver button
Air speed button
[2] Test Run Method
Operation procedure
1
Turn on universal power supply at least 12 hours before getting started
Displaying “HO” on display panel for about 5 minutes
2
Press TEST button twice Displaying “TEST RUN’’ on display panel
3
Press
selection button
Make sure that air is blowing out
4
Press
select button to change from cooling to heating operation, and vice versa
Make sure that warm or cold
air is blowing out
5
Press
adjust button
Make sure that air blow is changed
6
Press
or
button to change wind
Make sure that horizontal or downward blow is adjustable.
7
Make sure that indoor unit fans operate normally
8
Make sure that interlocking devices such as ventilator operate normally if any
9
Press ON/OFF button to cancel test run Stop operation
Note 1: If check code is displayed on remote controller or remote controller does not operate normally.
2: Test run automatically stops operating after two hours by activation of timer set to two hours.
3: During test run, test run remaining time is displayed on time display section.
4: During test run, temperature of liquid pipe in indoor unit is displayed on remote controller room temperature display section.
5: When pressing
adjust button, depending on the model, “NOT AVAILABLE” may be displayed on remote controller.
However, it is not a malfunction.
6: When pressing
or
button, depending on the model, “NOT AVAILABLE” may be displayed on remote controller.
However, it is not a malfunction.