136
7 PROCEDURES BEFORE OPERATION
3.
Program execution
Power off the SIL2 Process CPU and remote head module in both systems. Then, set the RUN/STOP/RESET switch for the
SIL2 Process CPU and remote head module in both systems to RUN, and turn the power of both systems on. Check that the
SIL2 Process CPU PROGRAM RUN LED for the control system turns on.
If the RUN/STOP/RESET switch is set to RUN in power-on state, a continuation error of operating status
mismatch is detected in the standby system.
4.
Program monitoring
Use the engineering tool to check that programs run normally.
Summary of Contents for MELSEC iQ-RX40NC6B
Page 1: ...MELSEC iQ R I O Module With Diagnostic Functions User s Manual Application RX40NC6B RY40PT5B ...
Page 2: ......
Page 125: ...4 OVERVIEW 123 4 MEMO ...
Page 191: ...12 MAINTENANCE AND INSPECTION 189 12 MEMO ...
Page 227: ......