2.1.2 The counter-force applied to the installation surface
The counter-force applied to the installation surface for the strength design of the robot installation surface is
shown.
Table 2-2 : Value of each counter-force
Note4) The value of the following movement which applied MvTune2 (high-speed movement mode) with the carrying mass of 1kg.
・ The cycle time may increase with the case where the positioning accuracy of the work etc. is necessary, or by the moving position.
・ A transportation frequency during the conveyor tracking operation is 140-160 times/min. A transportation frequency may be
reduced by the posture of a robot, working environment, temperature, or a shape of a hand.
Note5) This is the downwards pressing force that occurs at the end of the load when the maximum load is on board and the J1, J2 and J4 axis are
in their resting state. Please operate at this level or below. When pressing for long periods of time, an excess load error may occur. Please
operate in a manner that does not cause errors.
Note6) The pose repeatability details are given in
Page 19, "2.2.1 Pose repeatability"
.
Note7) Sets the robot's operating environmental temperature as parameter OLTMX. Corresponding to the environment, the continuous control
action performance and the overload-protection function are optimized. (Refers to "Optimizing the overload level" described in "Chapter 5
Functions set with parameters" of separate instruction manual/ Detailed explanations of functions and operations for details.)
Note8) The 8-wire cable designated for LAN wiring can also be used for backup wiring.
Note9) The φ4 secondary piping can be obtained with the electromagnetic valve (option). Details regarding the electromagnetic valve (optional)
are shown on
Page 47, "(3) Solenoid valve set"
.
Note10) The protection specification details are given in
Page 25, "2.2.7 Protection specifications"
.
Note11) Direct jet flow to the bellows section is not included.
Note12) The conditions necessary to guarantee cleanliness are as follows: clean room down flow 0.3 m/s or greater.
Item
Unit
Value
Falls moment: M
L
N ・ m
610
Torsion moment: M
T
N ・ m
807
Horizontal translation force: F
H
N
1,575
Vertical translation force: F
V
N
712