MEES19K180
PURY-HP-T(S)NU-A, Y(S)NU-A
120
13. OUTDOOR INSTALLATION
Hyper Heating Inverter R2-Series
13-3-5. Refrigerant pipe routing
13-3-4. Installation
When the pipes and/or cables are routed at the bottom of the unit, make sure that the through hole at the base of
the unit does not get blocked with the installation base.
When the pipes are routed at the bottom of the unit, the base should be at least 100 mm [3-15/16 in.] in height.
Installation base parallel to the unit's front panel
Installation base perpendicular to the unit's front panel
(Unit: mm[in.])
Bottom view
HP72, 96, 120
A
For transmission cables
For wires
For pipes
Usage
NO.
Specifications
Bottom through hole
ø65 Knockout hole
[2-9/16]
ø52 Knockout hole
[2-1/16]
150 × 94 Knockout hole
[5-15/16] [3-3/4]
ø34 Knockout hole
[1-3/8]
Bottom through hole
Bottom through hole
Bottom through hole
B
D
C
The gaps around the edges of through holes for pipes and
wires on the unit allow water or mice to enter the unit and
damage its parts. Close these gaps with filler plates.
This unit allows two types of pipe routing:
• Bottom piping
• Front piping
To prevent small animals, water and snow from
entering the unit and damage its parts, close the
gap around the edges of through holes for pipes
and wires with filler plates.
CAUTION
Fill the gap at the site
Example of closure materials
(field supply)
172
152[6]
1
10[4-3/8]
185
29.5
90[3-9/16]
[3-9/16] 90
1060 [41-3/4]
29.5
(740)[29-3/16]
(Mounting pitch)
(Mounting pitch)
2×2-14[9/16]×31[1-1/4] Oval hole
2×2-14[9/16]×20[13/16] Oval hole
(without detachable leg)
[8-9/16]
216
[6-13/16]
[5-15/16]
150
[5-1/16]
128
[3-1/8]
79
[3-3/4]
94
[6-9/16]
166
[1-3/16]
[7-5/16]
[26-13/16]
([26-3/4~26-15/16])
681(678~684)
[1-3/16]
A
B
C
D
0000005744.BOOK 120 ページ 2020年2月25日 火曜日 午後5時19分