Chapter  Three 

 

 

3.1  Hoist and transpotation 

3.2  The  preparing  requirements  of  the  machine 

installation and adjustment 

3.3  The work shop and environment requirements 

3.4  Utility requirements

 

 

 

Summary of Contents for MC-1250

Page 1: ...1 36 Mintech MC 1250 Operating manual...

Page 2: ...ting the machine Do not use the machine in condition of opening the door of the control cabinet Every effort has been made to ensure that the data given in this document is accurate The information fi...

Page 3: ...36 Chapter One Safety Instructions and Precautions Chapter Two general description Chapter Three Installation and Utility Requirements Chapter Four Operation Chapter Five Maintenance and Troubleshooti...

Page 4: ...4 36 Chapter One 1 1 General Information 1 2 Laser Safety 1 3 Safety Instructions in Operation 1 4 Safety Instructions in Maintenance...

Page 5: ...afety procedures must use this equipment 1 1 General Information 1 1 1 Symbols Used in This Manual This symbol is intended to alert the operator to the presence of dangerous voltages that may be of su...

Page 6: ...ng over the beam path or focus the cutting head and adjust the beam delivery optics 1 2 Safety instruction about the laser This laser is a Class 4 laser product there are warning labels on the laser u...

Page 7: ...contact with the output beam from the laser will cause serious damage and may cause blindness Avoiding Laser Radiancy ensure that the beam is not directed towards reflective objects and that laser li...

Page 8: ...latile substances such as alcohol gasoline ether and other solvents and can damage the light sensitive elements in videp cameras photomultipliers and photodiodes Use protective eyewear when operating...

Page 9: ...er safety Guide Laser Institute of American 9th Edition Orlando FL 1993 D Sliney and M Wolbarsht Safety with Lasers and Other Optical Sources Plenun Publishing Company New York N Y 1980 Many of these...

Page 10: ...more than 60 Switch on the main power supply water cooler switch air switch and the start up switch of the system in order 1 3 2 Safety instructions when the machine startup Before power on ensure mac...

Page 11: ...is a yellow lamp on the frame of machine When laser on the lamp is turned on Simulated run the new program when the laser does not work and check to make sure the program logic is correct 1 3 4 Safety...

Page 12: ...12 36 Chapter Two 2 1 Introduction 2 2 Technical specification 2 3 Machine structure...

Page 13: ...omputer system so as to guarantee high precision and reliability meanwhile make the machine more cost effective When cut some materials such as acrylic some harmful gas smoke or powder may be produced...

Page 14: ...g accuracy X Y 0 002 39 4 0 05mm 1000mm Repeatability accuracy 0 002 0 05mm Full current 13A Gross Power 1500W Pressure of accessorial gas source 0 6MPa Operating Temperature 32 104 0 C 40 C Operating...

Page 15: ...f laser unit the cutting machine control system water chiller Figure 2 1 Laser cutting machine 2 3 1 The cutting machine The cutting machine consists of the base worktable gantry frame cutting head an...

Page 16: ...ing quality we must make laser beam passing nozzle coaxially without being curtained off so we need carry out adjustment of the nozzle Adjustment means of coaxial situation Rotate four handwheels 5 ma...

Page 17: ...odically clean up in time If appearing abnormity please contacting manufacturer The laser units were already adjusted over before leaving factory the untrained people can not open laser shield can not...

Page 18: ...e is lower than 5mg m3 the content of oil is lower than 0 1 mg m3 The operator should open the drain valve every eight hours The methods of adjusting the air pressure Pull up the adjusting button of t...

Page 19: ...19 36 Chapter Three 3 1 Hoist and transpotation 3 2 The preparing requirements of the machine installation and adjustment 3 3 The work shop and environment requirements 3 4 Utility requirements...

Page 20: ...hine installation and adjustment a Gradienter 200mm accuracy 0 02mm m b De mineralised water 30L c Air pump offer the compressed air and the compressed air must be oil free and dry refer to section 2...

Page 21: ...mended that air conditioner should be fixed in the workshop If the electric welding machine is used in the workshop never use the common net with the machine power supply and the distance between the...

Page 22: ...power supply is credibly earthed 4 Use the correct power supply Voltage Rated voltage 10 3 4 2 Water chiller specification The cooling water pressure is between 0 06MPa to 0 3MPa and the water flow is...

Page 23: ...Do not touch inside prevent high speed fan and high temperature from hurting body Pay attention to the water line of tank at any moment Under the state of full water in all pipes 3 4 3 Requirements of...

Page 24: ...24 36 Chapter Four 4 1 Notices 4 2 Introduction 4 3 Operating Interface 4 4 Operating Steps Operation...

Page 25: ...2 Check up the main power supply switch 3 The ground of main power supply cross section area is more than 4mm2 4 The air pressure of the accessorial air source is not less than 0 6MPa and the working...

Page 26: ...26 36 4 3 Operating Interface...

Page 27: ...m processing Program name Cutting speed adjustment Power Corner power Jog setting Information bar X Y movement and reset Following system Test button Manual air button Exhaust start Enter setting page...

Page 28: ...tting procedure You can draw up the plan by AutoCAD or other drawing software and must save as DXF file format 4 4 3 Power On a Start the computer b Start the water chiller system c Start the air pump...

Page 29: ...en d Finished the cutting 4 4 5 Power off a Push the Emergency button down b Switch off the cutting machine c Shut off the air pump d Shut off centrifugal exhaust fan e Shut off the computer f Shut of...

Page 30: ...2 Chapter Five 5 1 Lubrication Requirements 5 2 Daily inspection 5 3 Optics inspection and cleaning 5 4 Adjustment of the Beam Delivery Optics 5 5 Troubleshooting Maintenance and Troubleshooting...

Page 31: ...k and a nut 5 2 Daily inspection Check the voltage of the power supply everyday Check the temperature humidity of the environment everyday Clean the surface of workbench and vent with wet dishcloth ev...

Page 32: ...taining the light route strictly prohibit to touch the surface of the lens by hand strictly prohibit to blow to the surface and wipe it directly Open the cover of the light route periodically Check to...

Page 33: ...aces when adjusting the beam delivery optics and machining If laser radiation is exposed to the skin it can burn and cut the flesh The adjustment maintenance of the beam delivery optics must only be c...

Page 34: ...nsure the output beam parallel to Y axis and vertically incident to the center of mirror B 3 Adjust the mirror B to ensure the output beam parallel to X axis and vertically incident to the center of m...

Page 35: ...ure on the air manometer the indicator on the operating panel is active and buzzer makes a sound Solution Please check the air pump and the whole gas way or change the air source Running the program a...

Page 36: ...connections of control cable is credible and damaged Solution Check the control cable between the computer and the machine Cancel the screen savers when the machine is working Only perform the cuttin...