3. Installation and Utility Requirements
3.1
Hoist and transportation
It is necessary to fix the moving parts and the whole machine when packing.
Pay attention to machine net weight and the position of center of gravity while
the machine is being hoisted. The jacks should have enough carrying capacity.
It is strongly recommend that moving the machine
must be lightly, slowly and smoothly, and collision and
leaning should be avoid.
The machine net weight is 450kg, so the forklift weight load should be
more than 1000kg and the tip of the prong should exceed center of gravity of
the machine by 500 milimeters.
3.2 The preparing requirements of the machine installation and
adjustment
a.
Gradienter (200mm),
accuracy: 0.02mm/m
b.
De-mineralised water (30L)
c.
Air pump offer the compressed air and the compressed air must be oil-
free and dry.
(refer to
section
2.3.4)
d.
Special regulator to the gas bottle and special tube(
φ
6
mm).
e.
Machine installation: ensure the machine is horizontal.
f.
The connections of gas and water diagram refer to appendix figure 3,4.
*
Dismantling all setscrews of conveying state.
3.3 The workshop and environment requirements
The users should complete the following requirements before the machine
entered the factory.
3.3.1 Workshop requirements
The machine floor area is
3600mm
×
1800mm/4500mm
×
2200mm
, and it is
recommended that the workshop area is 5000mm×4000mm/
5500mm
×
4500mm
.
The door width is more than 2000mm/2500mm and height is more than
1500mm. Refer to figure 3-1 for the machine dimensions.