Installing the Batteries
Getting Started
3 - 4
BP10 Operator’s Manual
3.4
Installing the Batteries
You can use two AA batteries or a lithium-ion rechargeable battery pack to run BP10.
The runtime depends on the battery solution your choose. A lithium-ion battery pack
provides the longer runtime. For details about the recommended AA batteries, refer to
WARNING
•
Only use specified batteries. Use of other batteries will adversely affect the
batteries:
◆
Level reporting
◆
Low battery prompt
◆
Life performance
NOTE
•
Always keep the battery compartment dry.
•
Never use brute force to install the lithium-ion battery pack or AA battery
frame. Otherwise the waterproof ring surrounding the battery frame edge
may be broken to affect the waterproof performance.
•
The lithium-ion rechargeable battery shall be fully charged prior to first use.
To install batteries, follow this procedure:
1.
Lift up the lithium-ion battery pack or AA alkaline battery tray at the bottom of
BP10.
Figure 3-1 Open the Battery Pack
2.
Make sure the battery compartment is empty.
3.
Install AA batteries or lithium-on battery.
◆
If AA batteries are used, insert two 1.5V alkaline AA batteries according to
the diagram at the bottom of the battery frame.
Summary of Contents for BP10 NIBP Module
Page 1: ...BP10 NIBP Module Operator s Manual...
Page 2: ......
Page 11: ...BP10 Operator s Manual 1 1 1 Safety Safety Information 1 2 Equipment Symbols 1 5...
Page 16: ...Equipment Symbols Safety 1 6 BP10 Operator s Manual This page intentionally left blank...
Page 38: ...Service Menu Configuring BP10 4 6 BP10 Operator s Manual This page intentionally left blank...
Page 73: ...BP10 Operator s Manual 11 1 11 Accessories NIBP Accessories 11 2 Miscellaneous 11 3...
Page 76: ...Miscellaneous Accessories 11 4 BP10 Operator s Manual This page intentionally left blank...
Page 87: ...BP10 Operator s Manual B 1 B EMC...
Page 93: ...BP10 Operator s Manual C 1 C FCC Compliance...
Page 95: ...BP10 Operator s Manual D 1 D Symbols and Abbreviations Units D 2 Symbols D 3 Abbreviations D 3...
Page 98: ...Abbreviations Symbols and Abbreviations D 4 BP10 Operator s Manual P power PR pulse rate...
Page 99: ......
Page 100: ...P N 046 011008 00 4 0...