Shuttle
&
Rail
Installa
tion
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
(Page
3
o
f
1
1)
Litho
in
U.S.A.
COSHP
,
COSHM,
COSHQ1
1
1/1
12,
COLFP
,
COLFM,
COLFQ1
1
1/1
12
MIQCOSHMCE/2012333A
SHUTTLE
RAILS
MUST
BE
PERFECTL
Y
PARALLEL
TO
DR
YER
FACES
Floor
rails
must
be
parallel,
level,
and
square
along
entire
length
of
rail.
Y
90°
DR
YER
REFERENCE
LINE
EQUAL
EQUAL
EQUAL
SHUTTLE
FLOOR
RAILS
Use
rail
spacing
guide
to
insure
the
two
rails
are
parallel
to
each
other
.
SHUTTLE
Gap
between
Dryer
Load
Shelf
and
Shuttle
should
be
.
1”(25mm)
Rail
Installa
tion:
F
loor
Rails
23
Summary of Contents for COLFM 111
Page 2: ......
Page 4: ......
Page 5: ...Safety Information 1 1 ...
Page 22: ......
Page 23: ...Installation 2 19 ...
Page 48: ......
Page 49: ...Service and Maintenance 3 45 ...
Page 88: ......
Page 89: ...Dimensional Drawings 4 85 ...
Page 90: ......
Page 91: ...87 ...
Page 92: ...88 ...
Page 93: ...89 ...
Page 94: ......
Page 95: ...91 ...
Page 96: ......
Page 97: ...93 ...
Page 98: ...94 ...
Page 99: ...95 ...
Page 100: ...96 ...
Page 101: ...97 ...
Page 102: ...98 ...
Page 103: ...99 ...
Page 104: ...100 ...