R
ATTENTION
INSTALLERS!
FLOOR IS UNEVEN
SHUTTLE RAIL BRACKETS
MUST BE GROUTED TO Z
SHUTTLE RAILS MUST BE PERFECTLY
PARALLEL TO DRYER FACES
DRYER FACES MUST BE FLUSH
Establish System Zero Line or Z.
Find highest point in factory floor where footpads will be located.
System Zero Line or Z is 1” above highest point.
Shim & level to System Zero Line or Z.
Grout & anchor all brackets.
L
with leveling bolt
footpads
evel
to System Zero
Line or Z.
Grout & anchor all
.
Floor rails must be parallel, level, and square along entire length of rail.
MOVE TO
FOOTPAD LOCATIONS
TO NEXT
FOOTPAD
Z
Z
Y
Y
90°
90°
MARK
POINT
LASER
LEVEL
LEVEL
ROD
FOOTPAD
HIGHEST
POINT
FOOTPAD
HIGHEST
POINT
MINIMUM
GROUT
1” (25mm)
MINIMUM
GROUT
1” (25mm)
FOOT
PAD
FOOT
PAD
GROUT
GROUT
GROUT
SYSTEM
ZERO
LINE
SYSTEM
ZERO
LINE
DRYER
REFERENCE
LINE
DRYER
REFERENCE
LINE
SHUTTLE FLOOR RAIL
5’ MINIMUM LEVEL
FLUSH
+/- .125”(3mm)
FLUSH
+/- .125”(3mm)
EQUAL
EQUAL
EQUAL
SHUTTLE
FLOOR
RAILS
Use rail spacing guide
to insure the two rails
are parallel to each other.
SHUTTLE
Gap between Dryer Load
Shelf and Shuttle should be
.
1”(25mm)
B2T2007003/2013125A
Z
GROUT
DRYER FEET MUST
BE GROUTED
Y
Z
FOOTPAD
HIGHEST
POINT
MINIMUM
GROUT
1” (25mm)
GROUT
SYSTEM
ZERO
LINE
GROUT
Leveling
Bolts
Supplied
5/8”-11 x 3”
Leveling Bolt
Washer
Z
DRYER MUST BE LEVEL
Z
LEVEL
LEVEL
GROUT
SYSTEM
ZERO
LINE
LOAD
SHELF
Rail leveling plates
are also provided
for fine adjustment
of rail.
20
Summary of Contents for COLFM 111
Page 2: ......
Page 4: ......
Page 5: ...Safety Information 1 1 ...
Page 22: ......
Page 23: ...Installation 2 19 ...
Page 48: ......
Page 49: ...Service and Maintenance 3 45 ...
Page 88: ......
Page 89: ...Dimensional Drawings 4 85 ...
Page 90: ......
Page 91: ...87 ...
Page 92: ...88 ...
Page 93: ...89 ...
Page 94: ......
Page 95: ...91 ...
Page 96: ......
Page 97: ...93 ...
Page 98: ...94 ...
Page 99: ...95 ...
Page 100: ...96 ...
Page 101: ...97 ...
Page 102: ...98 ...
Page 103: ...99 ...
Page 104: ...100 ...