Shuttle
&
Rail
Installa
tion
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
(Page
1
o
f
1
1)
Litho
in
U.S.A.
COSHP
,
COSHM,
COSHQ1
1
1/1
12,
COLFP
,
COLFM,
COLFQ1
1
1/1
12
MIQCOSHMCE/2012333A
FLOOR
IS
UNEVEN
Establish
System
Zero
Line
or
Z.
Find
highest
point
in
factory
floor
where
footpads
will
be
located.
System
Zero
Line
or
Z
is
1
”
above
highest
point.
MOVE
TO
FOOTP
AD
LOCA
TIONS
TO
NEXT
FOOTP
AD
Z
MARK
POINT
LASER
LEVEL
LEVEL
ROD
FOOTP
AD
HIGHEST
POINT
MINIMUM
GROUT
1”
(25mm)
FOOT
PA
D
FOOT
PA
D
SYSTEM
ZERO
LINE
SHUTTLE
RAIL
BRACKETS
MUST
BE
GROUTED
TO
Z
Shim
&
level
to
System
Zero
Line
or
Z.
Grout
&
anchor
all
brackets.
Z
MINIMUM
GROUT
1”
(25mm)
SYSTEM
ZERO
LINE
SHUTTLE
FLOOR
RAIL
5’
MINIMUM
LEVEL
Z
GROUT
F
loor
Rails
Rail
Installa
tion:
FOOTP
AD
HIGHEST
POINT
GROUT
GROUT
GROUT
Rail
leveling
plates
are
also
provided
for
fine
adjustment
of
rail.
21
Summary of Contents for COLFM 111
Page 2: ......
Page 4: ......
Page 5: ...Safety Information 1 1 ...
Page 22: ......
Page 23: ...Installation 2 19 ...
Page 48: ......
Page 49: ...Service and Maintenance 3 45 ...
Page 88: ......
Page 89: ...Dimensional Drawings 4 85 ...
Page 90: ......
Page 91: ...87 ...
Page 92: ...88 ...
Page 93: ...89 ...
Page 94: ......
Page 95: ...91 ...
Page 96: ......
Page 97: ...93 ...
Page 98: ...94 ...
Page 99: ...95 ...
Page 100: ...96 ...
Page 101: ...97 ...
Page 102: ...98 ...
Page 103: ...99 ...
Page 104: ...100 ...