
Pellerin Milnor Corporation
97
Push-Down Travel Dimensions and Adjustment Procedures
BNWVUM01.C02 0000278454 A.4 B.2 A.2 3/5/20 1:08 PM Released
CAUTION:
Some of the following procedures require power to the machine. Take the
necessary precautions to assure that no one operates the machine controls while personnel
are adjusting the push-down components.
42" Divided Cylinder Machines
BNWVUM01.T03 0000278453 A.4 B.2 A.3 3/6/20 9:06 AM Released
The push-down stops on these machines consist of brackets attached to the shell and rubber rest
pads, mounted atop the base pads (see
Figure 49: Push-down Travel Adjustment: 42" Div-cyls
) which make contact when the shell pushes down. The rubber rest
pads sit in metal pans and are raised or lowered by adding metal shims to or removing the shims
from inside the pans. Extra shims and adhesive for securing the shims were supplied with your
machine.
There is no specific push-down travel dimension for these machines; however, length of travel
must be adjusted as follows:
1. With the
Master switch
set to
off
, and the shell hanging free, measure the gap between each
bracket and base pad.
2. Add or remove shims from the appropriate pads as required to make all four gaps equal and
to insure that no rest pad protrudes completely from its metal pan.
Test for equal length of travel at all four locations as follows:
3. With four sheet metal shims of
equal
thickness, set one shim
on top of
each rubber rest pad,
such that at least a one inch length of the shim overhangs the outside edge of the pad.
4. Set the
Master switch
to
manual
, causing the shell to push-down.
Figure 49.
Push-down Travel Adjustment: 42" Div-cyls (42" Staph Guard
®
)
Legend
A...
Push-down housing (rest pads and brackets within)
B...
Rubber rest pad (shim between rubber pan and metal pan)
C...
Gaps must be equal.
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...