Figure 50.
Ring Weldments
Shimming Ring Weldments
Reconnecting Ring Weldments
Legend
A...
Mounting bracket
B...
Shell (hanging free)
C...
Frame
D...
Shims
E...
Ring weldment
F...
2"
3. Stack shims on top of the ring weldment as required to make each gap
exactly 2 inches
as
shown in the left side of
Figure 50: Ring Weldments, page 99
. If the gap at any location is
less than 2 inches without shims, the shell must then be raised in the frame, using the proce-
dures previously described.
4. Once the proper arrangement of shims is made, remount the ring weldment and shims to the
mounting bracket (see the right side of
Figure 50: Ring Weldments, page 99
). Any extra
shims may be stacked on the top side of the mounting bracket plate to which the ring weld-
ment is attached.
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...