
Pellerin Milnor Corporation
91
3. Put the two halves of the bronze
bushing around the shaft. Ensure
alignment by matching alignment
marks (large arrow).
4. Push the front and rear flanges (Item 2 & 3) onto
the bronze bushing (Item 1). Use only a hard rub-
ber mallet. Ensure spacers are loose.
5. Rotate the bushing so the seams are approxi-
mately 90 degrees to the flange openings.
6. Insert the seals (Item 7) in two locations (large ar-
rows). Use only hard rubber or plastic mallet.
Assembly Procedure
5 Sheets
6044SR2, 72044SR2/SR3
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...