
168
Pellerin Milnor Corporation
9 Pneumatic
BNWUUM02 / 2020084
BNWUUM02
0000277470
A.3
2/19/20 8:47 AM
Released
Servicing Air Cylinders
BNWUUM02.T01 0000277469 A.4 A.3 A.2 2/18/20 3:01 PM Released
This is the general procedure for rebuilding an air cylinder using a Milnor
®
furnished repair kit,
once the air cylinder has been removed from the machine. See the specific air cylinder and major
assembly parts drawing(s) for component identification and removal/replacement information.
Maintenance procedures require:
•
Two threaded rods and nuts, twice the length of the tie bolts.
•
The appropriate repair kit.
CAUTION:
EXPLOSION HAZARD —
Spring tension can cause air cylinder to burst
apart with great force during dissassembly. You can be struck by air cylin-
der parts.
�
Follow maintenance instructions carefully.
�
Wear eye protection.
NOTE:
Use a new locknut when re-assembling air cylinder (see the appropriate parts
drawing).
1. Replace two diagonally opposite tie bolts with threaded rods and nuts as shown in
2. Tighten nuts on the threaded rods until they contact the air cylinder.
3. Remove the other two tie bolts and the nuts, washers, clips, and actuators from the external
end of piston stem.
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...