
100
Pellerin Milnor Corporation
NOTE:
For instruction: push down travel dimensions and adjustment procedures, see
BNWVUM01
Cross Section: Machine Locked down for
Shipment
Adjustment Complete, Machine Up
Legend
A...
Machine Shell
B...
Remove shipping bolt before running machine. See
instructions for Adjustment of Hold Down
C...
Place extra shims above
D...
Unloaded 3-3/4”
E...
1/2” approx.
F...
2” travel of empty basket
G...
Setting blocks for adjustment. Blocks must hold
shell approximately 3/8” above base pads when ma-
chine is pushed down.
N1..
Be sure shell does not bottom on basepad, there must
be clearance at this point. Check each corner
N2..
Place shims here to adjust ring weldment so that all
four corners seat simultaneously.
Hold Down Adjustment
2 Sheets
6044SR2/SR3, 6044WR2/WR3, 72044SR2/SR3, 72044WR2/WR3
BPWVUJ03 / 2020245
BPWVUJ03.1
0000294996
A.4 A.5
6/11/20 2:02 PM
Released
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...