98
Pellerin Milnor Corporation
5. With the shell pushed down, attempt to pull each test shim out from between the bracket and
rubber pad. The test shims should all be tight. If any shim(s) are not pinched tightly between
the bracket and pad, take note of which one(s) are not.
Make final adjustments as follows:
6. Set the
Master switch
to
off
, remove the test shims and make the necessary changes to the
shims below the rubber pads as indicated by the above test.
7. Repeat Steps 3 through 6 as required, until this test is successful.
8. Once the adjustments are completed, secure all shims and rubber rest pads with the adhesive
provided.
60" Divided Cylinder Machines
BNWVUM01.T04 0000278485 A.4 B.2 5/15/20 10:18 AM Released
These machines have push-down stops on the four corners of the frame which appear as shown in
Figure 50: Ring Weldments, page 99
. When pushed down, the ring weldments (which move with
the shell) must seat firmly onto the plugs which are mounted atop the base pads. The push-down
travel dimension must assure that 1) the ring weldments and plugs are far enough apart when the
shell is not pushed down, so as not to interfere with the free movement of the shell, and 2) that all
four stops are in solid contact when the shell is pushed down. To accomplish this, proceed as
follows:
1. With the
Master switch
set to
off
and the shell hanging free, remove the bolts securing the
ring weldments to the mounting brackets. Set each ring weldment on top of its respective
plug, removing any shims which may have been used and placing them next to the ring
weldment.
2. Measure the gap between the top of the ring weldment and the bottom of the mounting brack-
et, at each location.
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...