
Pellerin Milnor Corporation
93
9. Refer to the illustration above. Ensure that the edges of the retainers (Item 4) meet but do not
overlap. Tighten the bolts (Item 5) in an alternate pattern. Constantly check assembly rotation.
Use only hand wrenches. If binding occurs, loosen the bolts and repeat.
10. With all bolts tightened rotate the assembly. Bend
the star tabs (large arrow) on the retainers. The
assembly should continue to rotate freely.
11. Assemble fittings (Item 8) and tubing for grease
supply line. Refer to document BPWG6I08 for
the lower disk brake shown in this illustration.
Assembly Procedure
5 Sheets
6044SR2, 72044SR2/SR3
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...