
112
Pellerin Milnor Corporation
Figure 53.
Exploded Views
Adjust the Pressure Plate
1...
With the inner tubes deflated, tighten the tension nut
(item 30), until two threads extend beyond the nut.
2...
Check the spring with air pressure applied to the in-
ner tubes. Verify that the spring is not over com-
pressed. If the spring height is only 3/4”, it will be
necessary to loosen the tension nut.
NOTE:
The door spring should be slightly com-
pressed. If the spring is compressed too much the air
bags will not be able to inflate and properly seal the door.
Legend
A-A.
Detail view A–A
B...
24 instances
C...
Liner
D...
Door gasket
E...
Tabs: Fold gasket tabs over the edge of the door and
anchor with holding strips (item 33) and screws on
the final assembly.
F...
Fill plate
G...
Apply glue (4) to both surfaces
H...
Pressure plate
Shell Doors
4 Sheets
72044WR3, 72044SR2
BPWG7D01 / 2020245
BPWG7D01.1
0000295236
A.4 B.4
4/19/21 11:40 AM
Released
Summary of Contents for 72044SR2
Page 2: ......
Page 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Page 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Page 113: ...This page intentionally blank ...
Page 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Page 129: ...This page intentionally blank ...
Page 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Page 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Page 149: ...This page intentionally blank ...
Page 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Page 173: ...This page intentionally blank ...