M
AINTENANCE
- 37 -
Chapter 6
M
AINTENANCE
6-1
M
AINTENANCE
S
CHEDULE
WHAT TO DO
WHEN?
HOW TO?
When the Pack
Alarm display is
blinking.
When the system
resistivity display is
blinking.
SmartPak
Replacement
After a system or tank sanitization.
See Section 6-2.
Final Filter
Replacement
The Final Filter is replaced when the SmartPak is
replaced or when the Product Water flowrate drops.
See Section 6-3.
Vent Filter
Replacement
Replaced when the SmartPak is replaced.
See Section 4-5.
Flow Calibration
When the Final Filter is replaced, or periodically.
See Section 4-10.
Tank Level
Calibration
Periodically.
See Section 6-5.
UV Lamp
Replacement and
UV Timer Reset
When the UV Lamp
Alarm display is
blinking.
See Sections 6-9 and
6-10.
Screen Filter
Cleaning
2 times a year or as necessary.
See Section 6-4.
Sanitization of the
System
Once a year. The SmartPak will have to be replaced
after the sanitization of the system.
See Sections 6-7 and
6-6.
Sanitization of the
Tank
Once a year.
See Section 6-8.
Summary of Contents for DIRECT-Q 3 SYSTEM
Page 1: ...User Manual DIRECT Q 3 SYSTEM DIRECT Q 3 UV SYSTEM...
Page 58: ...MAINTENANCE 50 G H...
Page 60: ...MAINTENANCE 52 M...
Page 63: ...MAINTENANCE 55 G H...