I
NSTALLATION
- 10 -
4-2
C
ONNECTION OF
T
UBING
Rotate the Direct-Q so you can see the back of the system (see photo A).
A
1.
FEEDWATER
TUBING
3.
OVERFLOW
TUBING
2. REJECT
TUBING
4. TANK
OUTLET
F
EEDWATER
T
UBING
Locate the Feedwater Tubing exiting from the bottom middle of the system (B). A 1/2 inch Female
GAZ fitting with a screen filter is attached at the end of this tubing. Unroll it until the fitting reaches
the Feedwater source.
Apply white tape on the thread of the 1/2 inch Male GAZ valve or fitting of the Feedwater source.
Connect the fitting to the valve (C).
B
C
FEEDWATER TUBING
1 2
3
4
Summary of Contents for DIRECT-Q 3 SYSTEM
Page 1: ...User Manual DIRECT Q 3 SYSTEM DIRECT Q 3 UV SYSTEM...
Page 58: ...MAINTENANCE 50 G H...
Page 60: ...MAINTENANCE 52 M...
Page 63: ...MAINTENANCE 55 G H...