I
NSTALLATION
- 14 -
HAZARD
!
4-4
I
NSTALLATION OF THE
S
MART
P
AK
Open the Tank Outlet Valve before installing a
new SmartPak. This keeps the tank from filling
until the SmartPak is rinsed out (A).
Do not touch the UV Lamp when replacing the
SmartPak.
I
NSTALLATION
Make sure the front cover is opened.
STANDBY should be viewed on the Display
(B).
Remove the SmartPak from its shipping box.
Remove the protective caps on the ports of the
SmartPak and from the system.
Locate the O-rings on the ports (C). Wet them
with water. It is preferable to wet them with
ultrapure water.
A
B
C
ATTENTION
Summary of Contents for DIRECT-Q 3 SYSTEM
Page 1: ...User Manual DIRECT Q 3 SYSTEM DIRECT Q 3 UV SYSTEM...
Page 58: ...MAINTENANCE 50 G H...
Page 60: ...MAINTENANCE 52 M...
Page 63: ...MAINTENANCE 55 G H...