M
AINTENANCE
- 39 -
I
NSTALLATION
Remove the new SmartPak from its shipping
box.
Remove the protective caps on the ports of the
SmartPak.
Locate the O-rings on the ports. Wet them with
water. It is preferable to wet them with ultrapure
water.
Install the SmartPak until it is fully seated into
the system ports as shown (D, E and F).
C
LOSE THE FRONT COVER
.
NOTE: The Tank Outlet Valve should be left open
(G).
D
E
F
G
Summary of Contents for DIRECT-Q 3 SYSTEM
Page 1: ...User Manual DIRECT Q 3 SYSTEM DIRECT Q 3 UV SYSTEM...
Page 58: ...MAINTENANCE 50 G H...
Page 60: ...MAINTENANCE 52 M...
Page 63: ...MAINTENANCE 55 G H...