3-14
Revised 08.2021
Operator’s Manual: 405 SLD Seed Express
™
Bulk Seed Tender
®
®
3.5 MACHINE BREAK-IN
A special break-in procedure has been
developed to ensure the integrity of the seed
tender when first put into service. Follow the
Before Starting instructions and then follow the
Inspections for 1/2, 5, and 10 hour instructions
at the appropriate interval.
After completing these instructions, follow the
normal service schedule in the Maintenance and
Service sections and the engine manual.
Before Starting Work:
1. Read and follow the instructions in this
manual, and the engine manual.
- Read the Pre-Operation Checklist.
2. Check wheel bolt torque and then again at
10, 25, and 50 miles.
- Refer to Section 6.2 Bolt Torque.
3. If needed, adjust the height of the gooseneck
hitch assembly. Refer to Section 3.7.2
4. Start the engine and check the controls.
Be sure that they function properly.
After Operating for 1/2, 5, and 10 Hours:
5. Check the machine fluid levels.
- Refill as necessary.
6. Check the tension and alignment of the
conveyor belt.
7. Check hardware and fasteners; frame to
trailer tie-downs, all fasteners, and wheel
bolts. Tighten to their specified torque.
8. At 10 hours, change the engine oil.
- Check engine manual for the specified oil.