P 5
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
32
33
34
39
40
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 32 QTY 1
No. 33 QTY 1
No. 34 QTY 1
No. 39 QTY 1
No. 40 QTY 1
Lay the bearers (No. 32, 33, 34, 39 &
40) onto a firm and level surface
(free from areas where standing
water can collect) as shown in the
illustration.
Fix the framing together at each
corner using 10x70mm screws,
ensuring the frame is flush.
10x70mm Screws
Pre drill
hole
70mm
screw
Step 2
Parts needed - No. 32 QTY 4
No. 35 QTY 1
No. 36 QTY 1
No. 37 QTY 1
No. 38 QTY 1
Arrange the remaining framing
(No. 32, 35, 36, 37 & 38) as
shown in the illustration.
*Ensure there is an equal
amount of space between
each frame.
Secure each of the frames in
place using 2x70mm screws for
each side of the bearer, ensur-
ing the framing remains level.
60x70mm Screws
32
32
IMPORTANT: Pre-drill before fixing screws.
IMPORTANT: Pre-drill before fixing screws.
32
32
32
32
38
37
36
35
Example picture
2 screws per bearer per end