
IMPORTANT: Pre-drill before fixing screws.
IMPORTANT: Pre-drill before fixing screws.
P 13
Please retain product label and instructions for future reference
Step 23
Parts needed - No. 50 QTY 1
Place the floor board’s (No. 50)
inside the building flush to the log
board on one side. Continue
adding the floor boards (
internally
)
making sure to interlock each
individual board.
Once all the floor boards are in
position secure each board into
position using 8x40mm screws.
350x40mm Screws
40mm
screw
Pre drill
hole
This is for illustrative purposes only and may differ from your floor.
50
Pre drill
hole
40mm
screw
Step 22
Parts needed - No. 51 QTY 8
No. 52 QTY 3
No. 53 QTY 16
Continue arranging the roof
board packs (A, B & C) onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
*HINT: keep the roof board
packs seperate so as not to
mix up the positions.
Once you are happy with the fit
of the roof boards, fix the
second board of this layer into
place as shown in the diagram.
Use 2x40mm screws per board
ensuring to fix through the roof
board into the truss below.
18x40mm Screws
51
52
53
53
53
53
50
51