IMPORTANT: Pre-drill before fixing screws.
IMPORTANT: Pre-drill before fixing screws.
P 12
Please retain product label and instructions for future reference
Pre drill
hole
40mm
screw
53
53
51
53
51
52
53
Step 20
Parts needed - No. 51 QTY 8
No. 52 QTY 2
No. 53 QTY 16
Continue arranging the roof
board packs (A, B & C) onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
*HINT: keep the roof board
packs seperate so as not to
mix up the positions.
Once you are happy with the fit
of the roof boards, fix the first
and third boards of this layer
into place as shown in the
diagram. Use 2x40mm screws
per board ensuring to fix
through the roof board into the
truss below.
34x40mm Screws
Step 21
Parts needed - No. 51 QTY 6
No. 52 QTY 2
No. 53 QTY 12
Continue arranging the roof
board packs (A, B & C) onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
*HINT: keep the roof board
packs seperate so as not to
mix up the positions.
Once you are happy with the fit
of the roof boards, fix the first
and third board of this layer
into place as shown in the
diagram. Use 2x40mm screws
per board ensuring to fix
through the roof board into the
truss below.
34x40mm Screws
Pre drill
hole
40mm
screw
51
53
52
53
53
51
53