20
Putting into operation
4.
Putting into operation
Caution:
The first time the appliance is operated, it must not be left unattended until it has reached
the steady state.
4.1
Connecting the appliance
Caution:
Observe the country-specific regulations when
making connections (e.g. in Germany DIN VDE 0100
with residual current circuit breaker). Observe the
connection and power ratings (see nameplate and
"Technical data" on page 14).
Plug the provided power cable into the rear of the
appliance and connect it to the power supply ( Fig. 10 ).
4.2
Switching on
Switch on the appliance by pressing the On/Off switch
on the front of the appliance ( Fig. 11 ).
If the appliance has never been operated before, you
will be prompted to set the operating language, date
and time when you first switch it on. A description of
how to do this is given from page 38. However, to get a
basic overview of operating the appliance, you should
read the following chapter first.
Fig. 10
Connect the power
cable to the rear of the appliance
ON
O
O
ON
N
N
N
O
O
N
O
Fig. 11
Switch on appliance