Mark ProVis Injection System
4 - 2
Recommended
Schedule
The injection system must be properly maintained to ensure that it is
in peak operating condition. Your individual maintenance schedule
depends upon how your injector is used; the type of procedures per-
formed, and frequency of use. The following guidelines represent a
suggested maintenance schedule:
Daily:
Before use each day, the system should be inspected, and the injector
head piston rod thoroughly cleaned.
Monthly:
Once a month, the entire system should be thoroughly inspected and
cleaned, and an operational checkout should be performed.
Annually:
Once per year, Electrical Leakage and Ground Continuity checks
should be performed.
NOTE
: Local regulations or hospital protocol may require elec-
trical leakage checks at more frequent intervals. If this
applies, local regulations for leakage must be followed.
MEDRAD also recommends that a complete system calibration and
performance checkout, by a qualified MEDRAD Service Representa-
tive, be performed once a year. Contact MEDRAD Factory Service, or
your local MEDRAD office for details.
In the United States, Canada, Europe, and other select areas of the
world, the MEDRAD Service Department offers Preventive Mainte-
nance Programs. These annual programs greatly assist in maintaining
accuracy and reliability, and can extend the life of the injection system.
Contact MEDRAD for details. In Europe, contact MEDRAD Europe
B.V., or your local authorized dealer, for further information. Refer to
Section 2 of this manual for address and telephone numbers.
NOTE
: Failures which occur due to lack of proper mainte-
nance, or abuse, will not be covered under warranty.
Summary of Contents for ProVis Mark V
Page 1: ...Service Manual KMP 870 98411 T 205 Rev D...
Page 2: ......
Page 3: ......
Page 4: ......
Page 15: ...Operating Guide 3 1 3 Operating Guide...
Page 16: ...Mark V ProVis Injection System 3 2...
Page 30: ...Mark V ProVis Injection System 7 4 Figure 7 1 Block Diagram Servo Control Card...
Page 31: ...Servo Control Card 7 5...
Page 37: ...Mark V ProVis Injection System 9 4 Figure 9 1 Block Diagram Control Panel Digital Logic...
Page 39: ...Mark V ProVis Injection System 9 6 Figure 9 2 Block Diagram Control Panel DC to DC Converter...
Page 49: ...Mark V ProVis Injection System 10 10 NOTES...
Page 60: ...Injector Head 13 7 Figure 13 1 Block Diagram Head Card...
Page 61: ...Mark V ProVis Injection System 13 8 NOTES...
Page 64: ...Imaging System Interface 14 3 Figure 14 1 Connector Locations...
Page 67: ...Mark V ProVis Injection System 14 6 Figure 14 2 Block Diagram Imaging System Interface...
Page 71: ...Mark V ProVis Injection System 14 10 NOTES...