Chapter 1
20
Getting Started Procedure
illustrates the steps needed to get started using a DT3034
board. This diagram is repeated in each getting started chapter; the shaded area in the
diagram shows you where you are in the getting started procedure.
Figure 1: Getting Started Flow Diagram
Install the Board and Load the Device
Driver (see
)
Wire Signals
Verify the Operation of the Board
Attach and Configure the Screw Terminal
Panel (see
)
Summary of Contents for Data Translation DT3034
Page 2: ...DT3034 User s UM 22359 M Manual Title Page...
Page 5: ......
Page 11: ...Contents 10...
Page 15: ...About this Manual 14...
Page 16: ...15 1 Overview Features 16 Supported Software 18 Accessories 19 Getting Started Procedure 20...
Page 22: ...Part 1 Getting Started...
Page 23: ......
Page 33: ...Chapter 2 32...
Page 39: ...Chapter 3 38...
Page 68: ...Part 2 Using Your Board...
Page 69: ......
Page 111: ...Chapter 6 110...
Page 123: ...Chapter 7 122...
Page 135: ...Chapter 8 134...
Page 141: ...Chapter 9 140...
Page 153: ...Appendix A 152...
Page 154: ...153 B Connector Pin Assignments...