Chapter 8
132
Using the DT3034 Calibration Utility
Once the DT3034 Calibration Utility is running and you have connected the required
calibration signals to the DT740 screw terminal panel, do the following to calibrate the analog
output subsystem on the DT3034 board:
1.
From the main menu of the DT3034 Calibration Utility, click
Configure
, and then
Board
.
2.
Select the name of the DT3034 board to configure from the combo box, and then click
OK
.
3.
From the main menu of the DT3034 Calibration Utility, click
Calibrate
, and then
D/A
.
4.
In the Meter Selection box, select the meter that you are using (
Internal
or
External
;
Internal is the default).
5.
In the Mode box, select
Calibrate
.
6.
In the D/A box, select
DAC 0
.
7.
In the Voltages box, select
–9.3750
.
8.
Physically adjust potentiometer R15 (labelled 0Z) on the DT3034 board until the display
reads
–
9.3750 V (within 0.001 V).
shows the location of this potentiometer.
Figure 41: Location of Potentiometers R12 to R15 on the DT3034 Board
9.
In the Voltages box, select
+9.3750
.
10.
Physically adjust potentiometer R14 (labelled 0G) on the DT3034 board until the display
reads +9.3750 V (within 0.001 V).
shows the location of this potentiometer.
11.
In the D/A box, select
DAC 1
.
12.
In the Voltages box, select
–9.3750
.
13.
Physically adjust potentiometer R13 (labelled 1Z) on the DT3034 board until the display
reads
–
9.3750 V (within 0.001 V).
shows the location of this potentiometer.
14.
In the Voltages box, select
+9.3750
.
15.
Physically adjust potentiometer R12 (labelled 1G) on the DT3034 board until the display
reads +9.3750 V (within 0.001 V).
shows the location of this potentiometer.
Potentiometers for the DACs
R12 -1G
R13 -
1Z
R14 - 0G
R15 -
0Z
Summary of Contents for Data Translation DT3034
Page 2: ...DT3034 User s UM 22359 M Manual Title Page...
Page 5: ......
Page 11: ...Contents 10...
Page 15: ...About this Manual 14...
Page 16: ...15 1 Overview Features 16 Supported Software 18 Accessories 19 Getting Started Procedure 20...
Page 22: ...Part 1 Getting Started...
Page 23: ......
Page 33: ...Chapter 2 32...
Page 39: ...Chapter 3 38...
Page 68: ...Part 2 Using Your Board...
Page 69: ......
Page 111: ...Chapter 6 110...
Page 123: ...Chapter 7 122...
Page 135: ...Chapter 8 134...
Page 141: ...Chapter 9 140...
Page 153: ...Appendix A 152...
Page 154: ...153 B Connector Pin Assignments...