M-B Multi-Service Vehicle
Page 4.77
Operation
© 2008 M-B Companies Inc.
All Rights Reserved
Figure 72
The drive spline is visible
NOTE:
The spline (Figure 73) should have a coating of grease
before attaching the PTO shaft.
Figure 73
The PTO shaft is inserted from the front of the MSV (Figure 74).
Line the universal joint up with the spline and push together. Make sure
the locking device or universal joint has compressed in grove of PTO
shaft (Figure 75).
PTO Access
Panel
Drive Spline
Locking Groove
Summary of Contents for Multi-Service Vehicle
Page 2: ...5 19 10 PN 904 154502 ...