USE AND MAINTENANCE
30
ENGLISH
cod. F07011426
4.0 MAINTENANCE
Here follows a list of various maintenance operations to be carried
out periodically. Lowered operating costs and a longer lasting
seeding machine depend, among others, on the methodical and
constant observation of mese rules.
CAUTION
- The maintenance periods listed in this booklet are only
indicative and are for on normal conditions on use, therefore
be varied depending the kind of service, the more or less
dusty surroundings, seasonal factors, etc. For more serious
conditions of service, maintenance will logically be done
more often.
- Before injecting grease, the nipples must be cleaned to avoid
mud, dustand foreign bodies from mixing with the grease,
otherwise they will reduce or even annul the effect of the
lubrication.
* Use
lithium-grease
and grease
slowly
(to avoid shield dama-
ges) while rotating the bearing unit. Go on greasing until you see
new grease escaping from the unit.
**
All nuts and bolts must be checked and tightened after
the first few hours of use
(within the first 8 hours).
Every 50 hours of implement use, all bolts and nuts must be
checked and tightened if necessary.
ATTENTION
- Always keep oils and grease out of reach of children.
- Always read the instructions and precautions shown on the
containers and on the product safety sheets.
- Avoid skin-contact.
- After use wash the equipment thoroughly.
- Dispose of grease and used oils in conformity with the le-
gislation in force.
ATTENTION
Before performing maintenance on the machinery, be sure
to wear appropriate personal protection equipment (safety
footwear, overalls, gloves and safety glasses).
ATTENTION
All maintenance operations must be carried out with the
equipment resting on the ground and disconnected from the
tractor, with support devices securely in place and the rear
rollers resting on the ground.
4.0.1 WHEN THE MACHINE lS NEW
Before starting work, grease all the points marked on pictogram
n° 7 (GREASE) on page 31 of this manual.
After the first few hours of operation, check that all the screws and
bolts are still well tightened.
When the machine is new, check all hoses and connections of
the hydraulic circuit before starting up the equipment. Thereafter,
check that they are in good safe operating conditions at least once
a year. We recommend checking that the screws, bolts and hydrau-
lic connections are well-tightened before use and after approx.15
hours of operation.
4.0.2 STORAGE
If, at the end of the season, a prolonged rest period is anticipated,
it is advisable to:
- Thoroughly wash the machinery with water and dry it.
- Carry out a careful inspection and replace any damaged or worn
parts.
- Securely tighten all screws and bolts.
-
Lubricate all non-painted parts.
- Discharge the hydraulic cylinders of system pressure.
- Protect the hydraulic cylinders and their hoses from damage. If
LUBRICATION PLAN
Every 50 hours of use Every 100 hours of use Before winter break
Roller bearings*
X
X
CHECKING PLAN
Hollow discs bearings-play absence - H .
X
Operating elements fastening
X
All bolts and nuts tightening**
X
(According to table below)
22x1,5
nylon block per mozzi elemento operatore
300
Summary of Contents for GASPARDO VELOCE
Page 18: ...cod F07011426 18 Notes...
Page 33: ...33 cod F07011426 Notes...
Page 48: ...cod F07011426 48 Notes...
Page 63: ...63 cod F07011426 Notes...