30 - User Manual - Sigillo
®
4.4.6 Check the elastic strings with hooks or the automatic lateral hooks (only if installed)
20/30 hours after assembling the system, carry out the following operations.
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK ELASTIC STRINGS OR
AUTOMATIC LATERAL HOOKS
monthly
Yearly c/o manufacturer or authorised workshop
Verify the conservation status of the hooking
components. If necessary, provide for their
replacement.
4.4.7 Replacement of broken or damaged fastening hooks on the outer board wall (only if installed)
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK FASTENING HOOKS
monthly
Yearly c/o manufacturer or authorised workshop
Replace the hooks at the first sign of wear and tear.
4.4.8 Check the contact plates (only if installed)
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK CONTACT PLATES
every fifteen days
Yearly c/o manufacturer or authorised workshop
Check the conservation status of the contact plates (if installed, only for electric covering system), and if
necessary provide for their cleaning.
4.4.9 Check the sliding paths of the covering
OPERATION
ORDINARY MAINTENANCE
EXTRAORDINARY MAINTENANCE
CHECK SLIDING CONDITIONS
monthly
Yearly c/o manufacturer or authorised workshop
Verify that the upper edges of the tipper body are intact and straight-line (absence of breaches on the locating surface) so
that the covering does not hit upon any defects while sliding.