VECTOR OPERATOR
-
INSTALLATION MANUAL
TRANSLATED DOCUMENT
0 CONTENTS
Read thoroughly all of these instructions before installing
the operator
Keep this manual in a safe place for future reference
This manual is meant exclusively for professional installers.
Installation Manual
VECTOR
1. PRODUCT IDENTIFICATION
1.1 Product Description
1.2 Symbol Description
1.3 Versions
1.4 Product EC Marking
1.5 Noise Statement
1.6 Radiation, Gas, Fumes and Dust Produced
by the Machine
1.7 Use in Flammable and/or Explosive Environments
1.8 Accessories
2. TRANSPORTATION, STORAGE AND MAINTENANCE
2.1 Machine Delivery Conditions
2.2 Transport Conditions
2.3 Storage Conditions
3. TECHNICAL DATA
3.1 General Dimensions
3.2 Technical Specifications
3.3 Low Energy
3.4 Operation
3.4.1 ON
-
OFF Switch
3.4.2 Mode Selection Switch
3.5 Installer Instructions
3.6 Decommissioning, Dismantling and Removal
3.7 Intended Use and Uses that Should be Avoided
3.8 Application Limitations
4. PRE
-
INSTALLATION
4.1 Training Requirements for Installation Technicians
4.2 Physical and Environmental Requirements
4.3 Electrical Pre
-
installation Requirements
5. INSTALLATION
5.1 Type of Arm that Can Be Installed
5.2 Installing the Operator
5.3 Positioning Levels for the Fixing Holes
5.4 Extendable Rigid Arm Installation
5.4.1 Rigid Arm and Guide Installation
5.5 Installing the Pushing Articulated Arm
5.5.1 Attaching the Arm to the Leaf
5.6 Spring Adjustment
5.7 Selecting Breaking Level without Power
5.8 Testing Operations
5.9 Connecting to the Power Supply
5.10 VECTOR Electronic Card
5.11 Electronic Connections
5.12 Arm
-
Type Selection
5.13 Connecting the Controls/Inputs
5.14 Connector to Auxiliary Outputs
5.15 Installing and Acquiring the Sensors
5.16 Dip
-
Switch Management
5.17 Display Management
6. COMMISSIONING
6.1 Start
-
up
6.2 Management and Use
6.2.1 Operational Logic Settings
6.2.2 Management of Electronic Locks
6.2.3 Program Switch Connector
6.2.4 External Peripherals Connectors (15 VDC)
6.2.5 Double Vector Connection and Use
6.2.6 Interlocking Connection and Use
6.2.7 Connection to a PC
6.2.8 Normal Stop and Emergency Stop
7. SAFETY
7.1 General Safety Instructions
7.2 Required Personal Protection Equipment
7.3 Identifying Dangerous Areas in the Machine
7.4 Risk Evaluation
7.5 Safety Regulations
8. MAINTENANCE AND INSPECTION
8.1 General Maintenance to be Performed by the User
8.2 Maintenance Tasks Exclusively Reserved for
the Manufacturer
9. TROUBLESHOOTING
10. APPENDIXES
10.1 EC Declaration of Conformity
10.2 Installation Check
-
list
10.3 Maintenance Book
10.3.1 Frequency of Interventions
10.3.2 Actions Log
10.4 Notes
Summary of Contents for VECTOR
Page 1: ...Installation Manual VECTOR Operator ...
Page 15: ...14 D00619EN v0 SWING OPERATOR INSTALLATION MANUAL 5 4 A 5 4 B Fig 4 Fig 5 D A B E C F ...
Page 16: ...15 D00619EN v0 SWING OPERATOR INSTALLATION MANUAL 5 4 C 5 4 D Fig 6 Fig 7 A A A A ...
Page 19: ...18 D00619EN v0 SWING OPERATOR INSTALLATION MANUAL 5 5 A 5 5 B Fig 12 Fig 13 A A ...
Page 47: ...46 D00619EN v0 SWING OPERATOR INSTALLATION MANUAL CARACTERÍSTICAS MECÁNICAS 10 4 Notes ...