www.mc-techgroup.com MP-
| 1.04.01
7
Correct
operation
Follow these basic safety precautions during installation, commissioning and operation of the
device:
Read this instruction manual before commissioning and operating the product. Please make sure
to follow all warnings and safety instructions.
Installation and commissioning of electrical devices must be carried out only by qualified skilled
personnel in compliance with the current regulations.
The installation and commissioning of the device must conform to the requirements of VDE 0100
be in compliance with all relevant regulations and standards.
Before connecting the device, please make sure to compare the supply voltage with the specified
voltage on the product label.
Protection against contact to components carrying high voltages: Disconnect the power supply
before opening the device for access. Make sure that all extern power supplies are disconnected.
Operate the device only in the permitted temperature and pressure ranges. For details please
refer to the technical data sheet or instruction manual.
Install the device only in protected areas, sheltered from sun, rain and moisture.
Do not use the bellows pumps MP-F05, MP-F05/R, MP-F10, MP-F10/R in hazardous areas.
If an operation involves sample gases, which are toxic and hazardous to the health, protective
measures need to be taken against any accidental leakage, e.g. unexpected damage of the
pump bellows, the related tubing or tube connections.
To troubleshoot failing or decreasing pump performance, we recommend installing a flow moni-
toring device downstream from the pump.
The pump is only designed for sample gases, which are not contaminated with particles. It might
be necessary to install a suitable particle filter upstream of the pump.
The pump is not designed for liquid. To protect the pump against condensate, a cooler might be
necessary to be installed upstream of the pump.
Only gas or gas mixtures can be used, which do not react with each other or with materials of
the pump components.
Installation, maintenance, inspections and any repairs of the devices must be carried out only by
qualified skilled personnel in compliance with the current regulations.
Summary of Contents for TEC1 Series
Page 21: ...21 TECHNICAL SPECIFICATIONS ...
Page 22: ...22 DRAWING INDEX TEC1 with Controller Outline Mounting 03P0003 ...
Page 23: ...23 TEC1 available options 03P0005 ...
Page 24: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 47: ...www mc techgroup com SR25 X X 1 01 01 23 Figure 11 Spare parts Drawing No 2435 1 07 0 ...
Page 48: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...Bellows pump series MP F MP F05 MP F05 R MP F10 MP F10 R Instruction Manual Version 1 04 01 ...