![Malmet WDS Series Operation, Maintenance And Installation Manual Download Page 14](http://html1.mh-extra.com/html/malmet/wds-series/wds-series_operation-maintenance-and-installation-manual_3960245014.webp)
WDS
Operation, Maintenance and Installation Manual
Issue 11
Page
13
14/02/2019
3.0 Loading and Operation
3.1 Urinal Bottle / Bedpan – Loading
Refer to laminated WDS Instructions
1. To open door, use or press
2. Place racks into the correct positions
3. Place bedpan lids into back of bowl rack
4. Place first bedpan onto top rack, or large/small slipper pan
5. Place second bedpan onto bottom rack or large/ small slipper pan
6. Place urinal bottles into rack
Lift bedpan rack up and lock
into position.
Check that bowl
rack is in the up
position
.