S12800 Routing Switch Installa
tion Manual V1.0
Maipu Confidential & Proprietary Information
Page 17
2 Installation Preparations
This chapter describes the precautions and related work before installing the device, containing
the following contents:
2.1 Check Device Running Environment
2.3 Open-Package and Inspection
When the device is delivered, there is the packing list. Please confirm whether the
accessories are complete and good according to the items in the packing list. If there is
damaged or loss, please contact Maipu technical staff to replace.
2.1 Check Device Running Environment
2.1.1 Check Equipment Room Conditions
To ensure the normal running of the device, take the corresponding measures to meet the
environment requirement of the device running:
Air conditioning and ventilation system can ensure the normal running temperature and
humidity conditions of the router. For details, refer to
.
The good grounding is the basis of the router running and the important guarantee
conditions of preventing lightning and resisting interference. Ensure that grounding meets
the grounding specifications. For details, refer to
Ensure that there is enough installation space and moving path space.
Ensure that the cleanness of the equipment room meets the requirement. Do not place the
router in the environment with lots of dust, such as in the being renovated passage.