S12800 Routing Switch Installa
tion Manual V1.0
Maipu Confidential & Proprietary Information
Page 18
2.1.2 Check Power Supply System
The good power supply system is the basis of the device power-on starting and stable running.
To meet the power supply requirement of S12800 routing switch, please complete the
following steps:
Step 1:
Estimate the whole power consumption of the device.
Step 2:
Select the appropriate power module according to the power consumption and
power supply mode of the device.
To ensure the normal running of the device, it is necessary to ensure that the
maximum output power of the device power module is larger than the whole
power consumption of the switch (it is suggested to reserve a certain power
derating.
Step 3:
Confirm that the power supply system of the installation place can meet the
input requirement of the device power.
Ensure that the power supply system of the installation place is stable and can
meet the input mode, rated input voltage and other parameter requirements of
the selected power module. For details, refer to
.
For the power consumption data and power module parameters of the
device, refer to
Appendix A Entire Device and Common Module
.
2.2 Safety Precautions
2.2.1 General Safety
Ensure that the ground of the installation place is dry and smooth and you have made the
anti-skidding measures.
Keep the device clean and dust-free; do not place the device in the damp place.
The whole device and the related parts (such as power and chassis) are heavy. When
moving and lifting, need several persons to cooperate and avoid that the body is scratched
by the sharp part of the equipment. During moving, please wear the working gloves.