S12800 Routing Switch Installa
tion Manual V1.0
Maipu Confidential & Proprietary Information
Page 32
Figure 3-11 The order diagram for installing the cabling rack
3.1.7 Install Power Module
Install in order according to the number of the purchased power modules. The power is packed
in the separate packing box, but not in the chassis packaging
Step 1:
Take out the power module from the packing box, and keep the accessories in
the box well.
Step 2:
Insert the power module to the power slot of the chassis, as shown in Figure 3-
12.
Figure 3-12 The diagram of installing the power module