101
MPB-311
Cleaning and maintenance
Interval
Work
Personnel
Monthly
Check the pedestrian gate for damage from the
outside.
Operator
Every 6 months
Check centre pillar, bicycle door, cage half, base
with handrail, guide element and upper barrier
for damage.
Technician
Check support beam for damage from inside and
outside. If necessary, clean support beam and
correct defect in paint work.
Technician
Check the floor bearing for the centre pillar for
ease of movement. Adjust play if necessary.
Technician
Check the floor bearing for the bicycle door for
ease of movement. Adjust play if necessary.
Technician
Check the screw connection of the flange
connection of the centre pillar.
Technician
Check the screw connection of the flange
connection of the bicycle door
Technician
Check the function of the locking mechanism for
the centre pillar.
Technician
Check the input function "emergency open".
Technician
Check the function of the external residual
current device.
Qualified electrician
Every 12 months-
Check electrical lines for damage.
Qualified electrician
Check all electrical connections for tightness.
Qualified electrician
Check the earthing of the support beam,
cover and service door for damage and
tightness.
Qualified electrician
Check signs and labels for completeness and
legibility.
Technician
Perform work as per the supplied log book.
Technician
Check the attachment screws of the pedestrian
gate.
Technician
According to the operator Check emergency function.
Operator
Table 9:
Maintenance schedule
Summary of Contents for MPB-311
Page 115: ...115 MPB 311 MPB 311...