5
MPB-311
Contents
Mounting the base with 2 railings and the cage half with
Preparing the mounting of the bicycle door
Mounting the floor bearing and the bicycle door
Mounting the floor bearing and the centre pillars
Mounting the upper barrier of the bicycle access
Connecting two pedestrian gates
Closing the cover of the support beam
Mounting the optional mounting pillar for access-control devices
Safety during electrical connection
Installing electrical protective devices
Opening and closing the cover or service door
Opening and closing the service door
Connecting customer control lines
Connecting emergency opening contacts
Installing and connecting customer access-control devices
Checking the electrical connections
10.1 Safety during commissioning
10.2 Putting the pedestrian gate into operation
10.3 Switching the pedestrian gate on and off
Summary of Contents for MPB-311
Page 115: ...115 MPB 311 MPB 311...