11
UK
1-10 DIRECTIONS FOR INSTALLA-
TION
To keep the machine in perfect working condi-
tion and to ensure precise and safe operation
for a long time, scrupolously follow the direc-
tions for installation given below.
- The machine must be installed in a closed,
dry place, with a temperature of +10
°
C to
+40
°
C.
- Sufficient space must be left clear around the
machine, so as to prevent the operator from
being jammed between the moving parts of
the machine and any surrounding object.
- The feeder cable must be laid in such a way
that it does not cause the operator to stumble.
- Mains voltage variations must not exceed
±
10%.
- The earth wire of the machine must be con-
nected to the earth wire of the plant.
1-11 DISCONNECTING PROCEDURE
Before carrying out any operation on the
machine, the following two-step disconnecting
procedure is to be followed:
A: Disconnect the machine from the mains.
B: Make sure that no power is being supplied
and that no residual energy is present.
A single person is to be responsible for the
carrying out of both operations.
Whenever the machine fails to operate, per-
form the above-mentioned disconnecting pro-
cedure and point out the situation with a clearly
visible inscription.
Fig.3
Summary of Contents for BIG 800
Page 5: ......
Page 8: ......
Page 16: ......
Page 17: ......
Page 20: ......
Page 24: ......
Page 29: ...28 NOTES...
Page 31: ......
Page 34: ......
Page 42: ......
Page 43: ......
Page 46: ......
Page 50: ......
Page 55: ...54 NOTES...
Page 57: ......
Page 60: ......
Page 68: ......
Page 69: ......
Page 72: ......
Page 76: ......
Page 81: ...80 NOTE...
Page 83: ......
Page 86: ......
Page 94: ......
Page 95: ......
Page 98: ......
Page 102: ......
Page 107: ...106 NOTAS...
Page 109: ......
Page 112: ......
Page 120: ......
Page 121: ......
Page 124: ......
Page 128: ......
Page 133: ...132 OPMERKINGEN...
Page 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Page 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 166: ......
Page 170: ......
Page 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 185: ...184...