13
UK
2-4
FITTING THE TOOL-HOLDING
ARM AND THE RELATED CON-
TROLS
The fitting of the arm can be dangerous, on
account of the considerable weight of the
object (about 60-90 kg).
Carry out the operation with the aid of a
lifting tool, or at least with the assistance of
somebody.
Fasten the base of the BASE-PILLAR-ARM
assembly to the bench (6) (see figure 6) by
means of the 4 screws (7) and the related
nuts (8) and washers (9).
WARNING
Fig.6
With regard to the figure detail, insert the arm
lifting handle (10), then hammer in the related
lockpin (11).
Take jacquard (12) with spacer (13), supplied
in a separate envelope, and fit them to the stud
screwed into the arm.
2-5
FITTING THE TOOL-HOLDING
HEAD
Remove lid (12) from the arm end (see fig. 7).
-
Drive locking knob (13) home as shown in
fig. 8.
-
Slide the Carriage-Fork-Motor assembly into
the slideways, trying to avoid shocks or jolts
capable of affecting the adjustment of the
bearings (fig. 8). The assembly was tested
by our Quality Dept.
-
Screw the lid back into place.
-
Now fasten spring (14) to the arm by using
the screw screwed in the arm itself. Slide
motor electrical cable (15) through the eye
of the spring as shown in fig. 9.
Make sure that the carriage can slide freely
without pulling the cable.
Fig.7
Fig.8
Fig.9
Summary of Contents for BIG 800
Page 5: ......
Page 8: ......
Page 16: ......
Page 17: ......
Page 20: ......
Page 24: ......
Page 29: ...28 NOTES...
Page 31: ......
Page 34: ......
Page 42: ......
Page 43: ......
Page 46: ......
Page 50: ......
Page 55: ...54 NOTES...
Page 57: ......
Page 60: ......
Page 68: ......
Page 69: ......
Page 72: ......
Page 76: ......
Page 81: ...80 NOTE...
Page 83: ......
Page 86: ......
Page 94: ......
Page 95: ......
Page 98: ......
Page 102: ......
Page 107: ...106 NOTAS...
Page 109: ......
Page 112: ......
Page 120: ......
Page 121: ......
Page 124: ......
Page 128: ......
Page 133: ...132 OPMERKINGEN...
Page 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Page 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 166: ......
Page 170: ......
Page 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 185: ...184...