9
UK
1-7
HANDLING AND HAULAGE
The radial arm saws machines are delivered in
a single package. The package dimensions
and weight are shown in the table.
Handling is possible by lifting and moving de-
vices such as:
- fork-lift trucks, bridge cranes, cranes
When handling the packages, make sure that
the area is clear of obstacles.
Store the packages in a dry place, sheltered
from the rain, snow and humidity.
During all handling phases, we recommend
excercising extreme caution so as to avoid
hurting people or damaging things or the ma-
chine itself.
It is advisable to keep the package for possible
subsequent transport purposes.
1-8
CONTENTS AND PACKAGE
Fig.1
WARNING
Model
A) Machine packing
Weight
Junior 640 1400 x 850 x 590 mm 220 kg
Big 800 1400 x 850 x 590 mm 246 kg
Best 960
1500 x 1000 x 550 mm
331 kg
Best 1250 1800 x 1000 x 630 mm 347 kg
Model
B) Wooden plane packing
Weight
Junior 640
1580 x 530 x 70 mm
30 kg
Big 800
1860 x 700 x 70 mm
38 kg
Best 960
2000 x 780 x 80 mm
46 kg
Best 1250
2400 x 1100 x 100 mm
75 kg
The package contains 2 boxes, the machine
and the wooden plane boxes.
When you open box A), machine, you find:
1) Handbook
2) Carriage
3) Tool kit
4) Bench screws and nuts
5) Self-centring lever for bench positioning
6) Bench locking handle
7) Lift handle knob
8) Cable holder spring
9) Carriage locking group and measuring in-
dexes
10) Blade guard assembly
11) Motor protector
12) Leg box containing the 4 bench legs
13) One right-hand square
14) One left-hand square
15) One centre square
16) Two locking wing-nuts
17) Bench
18) Arm with slides for tool carriage
19) Envelope with locking handle on pillar and
spacers
In package B) wooden table you will find:
1) The wooden worktable.
Before starting the assembly, it is advisable
to read the handbook thoroughly, as it pro-
vides all the information and directions re-
quired to safety operate the machine.
Summary of Contents for BIG 800
Page 5: ......
Page 8: ......
Page 16: ......
Page 17: ......
Page 20: ......
Page 24: ......
Page 29: ...28 NOTES...
Page 31: ......
Page 34: ......
Page 42: ......
Page 43: ......
Page 46: ......
Page 50: ......
Page 55: ...54 NOTES...
Page 57: ......
Page 60: ......
Page 68: ......
Page 69: ......
Page 72: ......
Page 76: ......
Page 81: ...80 NOTE...
Page 83: ......
Page 86: ......
Page 94: ......
Page 95: ......
Page 98: ......
Page 102: ......
Page 107: ...106 NOTAS...
Page 109: ......
Page 112: ......
Page 120: ......
Page 121: ......
Page 124: ......
Page 128: ......
Page 133: ...132 OPMERKINGEN...
Page 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Page 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 166: ......
Page 170: ......
Page 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 185: ...184...