12
CHAPTER 2 - INSTALLATION
2-1 ASSEMBLING NOTES
This chapter contains all the directions re-
quired to properly assemble the machine.
Before assembling the squaring machine, it is
advisable to choose a suitable place for the
installation, making allowance for the overall
dimensions of the equipment (see figure at
paragraph 1-9).
For safety distances refer to paragraph 2-2.
Place the machine in a closed room, in a
position suitable for work and for easy connec-
tion to the mains.
The area where the machine will be located
must be lit enough for both work and mainte-
nance activities.
Do not use bolts, nuts and screws other
than those indicated. Carefully follow the
assembling procedure described in the fol-
lowing chapters. Improper machine assem-
bly can result in extremely dangerous situ-
ations.
2-2
SPARE CLEARANCES AROUND
THE MACHINE
If the machine is to be properly used and easily
maintained under safe conditions, the area
around the installation site should be kept clear
as shown in the figure 4.
2-3
SETTING UP THE BENCH
Fasten the four legs to the bench as shown in
the figure. Use three screws (1), three nuts (2)
and six washers (3) for each leg.
The next step consists in making the machine
level.
WARNING
Fig.4
Fig.5
Use a spring level and turn screws (4) until the
machine is level. Tighten lock nuts (5), figure 5.
To ensure maximum safety and efficiency of
the machine, the floor is to be made of well-
levelled concrete. If the floor does not meet
such requirement, a concrete slab will have to
be prepared.
N.B.: Dimensions in mm
Summary of Contents for BIG 800
Page 5: ......
Page 8: ......
Page 16: ......
Page 17: ......
Page 20: ......
Page 24: ......
Page 29: ...28 NOTES...
Page 31: ......
Page 34: ......
Page 42: ......
Page 43: ......
Page 46: ......
Page 50: ......
Page 55: ...54 NOTES...
Page 57: ......
Page 60: ......
Page 68: ......
Page 69: ......
Page 72: ......
Page 76: ......
Page 81: ...80 NOTE...
Page 83: ......
Page 86: ......
Page 94: ......
Page 95: ......
Page 98: ......
Page 102: ......
Page 107: ...106 NOTAS...
Page 109: ......
Page 112: ......
Page 120: ......
Page 121: ......
Page 124: ......
Page 128: ......
Page 133: ...132 OPMERKINGEN...
Page 142: ...141 TAB 1 BENCH GROUP PL 1 GROUPE BANC TAV 1 GRUPPO BANCO TAB 1 GRUPO BANCO AFB 1 BANKEENHEID...
Page 150: ...149 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 154: ...153 TAB 3 ARM GROUP PL 3 GROUPE BRAS TAV 3 GRUPPO BRACCIO TAB 3 GRUPO BRAZO AFB 3 ARMEENHEID...
Page 166: ......
Page 170: ......
Page 179: ...178 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 181: ...180 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 183: ...182 e n g i n e e r i n g Via delle regioni 299 50052 CERTALDO Firenze...
Page 185: ...184...