![Maeda CC1908S-1 Operation Manual Download Page 232](http://html1.mh-extra.com/html/maeda/cc1908s-1/cc1908s-1_operation-manual_3362098232.webp)
6.15 INSPECTION AND MAINTENANCE LIST
M A E D A
Crawler Crane
6-24
5/2020 CC1908S-1
INSPECTION AND MAINTENANCE LIST
[Daily and unscheduled]
Inspection and maintenance item
Daily
Unscheduled
Before
starting work
Walk-around
inspection
Before
starting work
Before
starting
engine
Before
starting work
After starting
engine
Inspection around crane (machine body/fly jib) (
⇒
P. 6-28)
✓
Wire rope inspection (
⇒
P. 6-29)
✓
Hook block inspection (machine body/fly jib) (
⇒
P. 6-29)
✓
Inspection around upper slewing body (
⇒
P. 6-30)
✓
Cab inspection (
⇒
P. 6-30)
✓
Inspection around carrier (
⇒
P. 6-30)
✓
Cooling water level inspection/refilling (
⇒
P. 6-31)
✓
Engine oil level inspection/refilling (
⇒
P. 6-31)
✓
Fuel level inspection/refilling (
⇒
P. 6-32)
✓
Hydraulic oil tank oil level inspection/refilling (
⇒
P. 6-33)
✓
Fuel prefilter inspection (
⇒
P. 6-35)
✓
Electric wiring inspection (
⇒
P. 6-35)
✓
Boom working light and head light inspection (
⇒
P. 6-35)
✓
Horn operation inspection (
⇒
P. 6-36)
✓
Operator's seat adjustment (
⇒
P. 6-36)
✓
Irregular winding check mirror adjustment (
⇒
P. 6-36)
✓
Battery indicator inspection (
⇒
P. 6-37)
✓
Engine starting and abnormal noise inspection (
⇒
P. 6-37)
✓
Engine low speed and acceleration inspection (
⇒
P. 6-37)
✓
Engine exhaust gas colour, abnormal noise, and vibration
inspection (
⇒
P. 6-37)
✓
Crane operation inspection (
⇒
P. 6-38)
✓
Overwinding prevention device inspection (
⇒
P. 6-39)
✓
Moment limiter inspection (machine body/fly jib) (
⇒
P. 6-39)
✓
Winch wire rope replacement (
⇒
P. 6-79)
✓
Boom telescoping wire rope inspection/adjustment (
⇒
P.
6-84)
✓
Derrick wire rope inspection/adjustment (fly jib) (
⇒
P. 6-85)
✓
Crawler track shoe bolt looseness inspection/retightening
(
⇒
P. 6-86)
✓
Crawler track tension inspection/adjustment (
⇒
P. 6-87)
✓
Window washer solution inspection/refilling (
⇒
P. 6-88)
✓
Air-conditioner inspection/maintenance (
⇒
P. 6-89)
✓
Door rail and roller inspection/cleaning/greasing (
⇒
P. 6-90)
✓
Level gauge inspection (
⇒
P. 6-91)
✓
Summary of Contents for CC1908S-1
Page 2: ......
Page 10: ...CONTENTS M A E D A Crawler Crane viii 5 2020 CC1908S 1 This Page Intentionally Left Blank...
Page 11: ...INTRODUCTION...
Page 19: ...Chapter 2 SAFETY...
Page 45: ...SPECIFICATIONS...
Page 48: ...3 2 DIMENSIONAL DRAWINGS M A E D A Crawler Crane 3 4 5 2020 CC1908S 1 DIMENSIONAL DRAWINGS...
Page 49: ...M A E D A Crawler Crane 3 2 DIMENSIONAL DRAWINGS 5 2020 CC1908S 1 3 5...
Page 50: ...3 2 DIMENSIONAL DRAWINGS M A E D A Crawler Crane 3 6 5 2020 CC1908S 1...
Page 51: ...M A E D A Crawler Crane 3 2 DIMENSIONAL DRAWINGS 5 2020 CC1908S 1 3 7...
Page 63: ...M A E D A Crawler Crane 3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS 5 2020 CC1908S 1 3 19...
Page 64: ...3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS M A E D A Crawler Crane 3 20 5 2020 CC1908S 1...
Page 65: ...M A E D A Crawler Crane 3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS 5 2020 CC1908S 1 3 21...
Page 67: ...PARTS AND CONTROLS...
Page 117: ...OPERATION...
Page 209: ...MAINTENANCE AND INSPECTION...
Page 259: ...M A E D A Crawler Crane 6 17 PERIODIC MAINTENANCE 5 2020 CC1908S 1 6 51 1 2 3 7 6 5 4...
Page 326: ......