5.4 CRANE OPERATION
M A E D A
Crawler Crane
5-30
5/2020 CC1908S-1
5.
Remove the hook block (1) from the stowage
rope (2).
6.
Securely hitch the stowage rope (2) to the
rope hook (3).
HOISTING AND LOWERING
OPERATION
WARNING
• When hoisting a load, the load will shift
forward slightly due to boom deflection.
Notify slinging operators and other workers
in the vicinity.
• If the hook block is over-hoisted, the
overwinding prevention device detects
overwinding and the warning buzzer sounds
intermittently. When the buzzer sounds,
immediately place the right-hand control
lever in the neutral position to stop the
hoisting operation.
• When lowering the hook a long distance
such as for underground work, be sure to
leave at least three turns of wire rope on the
winch drum.
IMPORTANT
• Take care not to lower the hook block
excessively in order to prevent it from
coming into contact with the ground. Doing
so results in irregular winding on the winch
drum.
• When stopping the winch operation, do not
suddenly return the lever to its neutral
position. Doing so may loosen the wire
rope, resulting in irregular winding on the
winch drum.
5.4.5.1
NORMAL HOISTING AND
LOWERING
Operate the right-hand control lever (1) as
follows:
• Lowering: Push the lever forward.
• Neutral:
Release your hand from the lever.
The lever will return to the neutral
position and the hoisting/lowering
of the hook block stops.
• Hoisting:
Pull the lever toward you.
Adjust the winch hoisting and lowering
speed by varying the stroke of the right-hand
control lever (1) and the depression of the
accelerator pedal (2).
Summary of Contents for CC1908S-1
Page 2: ......
Page 10: ...CONTENTS M A E D A Crawler Crane viii 5 2020 CC1908S 1 This Page Intentionally Left Blank...
Page 11: ...INTRODUCTION...
Page 19: ...Chapter 2 SAFETY...
Page 45: ...SPECIFICATIONS...
Page 48: ...3 2 DIMENSIONAL DRAWINGS M A E D A Crawler Crane 3 4 5 2020 CC1908S 1 DIMENSIONAL DRAWINGS...
Page 49: ...M A E D A Crawler Crane 3 2 DIMENSIONAL DRAWINGS 5 2020 CC1908S 1 3 5...
Page 50: ...3 2 DIMENSIONAL DRAWINGS M A E D A Crawler Crane 3 6 5 2020 CC1908S 1...
Page 51: ...M A E D A Crawler Crane 3 2 DIMENSIONAL DRAWINGS 5 2020 CC1908S 1 3 7...
Page 63: ...M A E D A Crawler Crane 3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS 5 2020 CC1908S 1 3 19...
Page 64: ...3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS M A E D A Crawler Crane 3 20 5 2020 CC1908S 1...
Page 65: ...M A E D A Crawler Crane 3 4 WORKING RADIUS LIFTING HEIGHT DIAGRAMS 5 2020 CC1908S 1 3 21...
Page 67: ...PARTS AND CONTROLS...
Page 117: ...OPERATION...
Page 209: ...MAINTENANCE AND INSPECTION...
Page 259: ...M A E D A Crawler Crane 6 17 PERIODIC MAINTENANCE 5 2020 CC1908S 1 6 51 1 2 3 7 6 5 4...
Page 326: ......