5.
Remove second pin (A) using a slide hammer and
special welded nut and washer to fit in front of Diesel
Exhaust Fluid (DEF) tank.
NOTE:
Second pin (A) must be tapped forward and
extracted through the front of the frame due to
the position of the DEF tank.
Figure 3.4: Windrower Frame
6.
Move leg outwards to expose one hole (A).
7.
Reinstall pins and secure with bolts (B), washers, and
nuts. Torque nuts to 100 ft·lbf (136 N·m).
8.
Lower jack and remove it from the right-hand leg.
Figure 3.5: Windrower Frame
147764
10
Revision A