4.
Ensure caster wheels are positioned at equal distances
from the center of the windrower.
Figure 3.11: Widest Tread Width Shown
5.
Position bracket (A) as shown.
6.
Install two 3/4 in. x 2-3/4 in. hex head bolts (B) at
the back outboard location, and install two 3/4 in.
x 2-1/4 in. hex head bolts (C) at the back inboard
location.
7.
Install two 3/4 in. x 2-1/4 in. hex head bolts (D) to the
underside. Tighten bolts snug.
8.
Torque all bolts (B and C) at the back location to
330 ft·lbf (447 N·m).
9.
Torque all bolts (D) on the underside to 330 ft·lbf
(447 N·m).
10. Lower windrower to the ground.
IMPORTANT:
Torque all bolts to 330 ft·lbf (447 N·m) after the
first 5 and 10 hours of operation.
Figure 3.12: Walking Beam
147764
14
Revision A